Filament drive shootout
Inspired by Nophead’s excellent work, I decided to do my own testing. I had the folks up at Najet make me a prototype and pitted it against the existing timing belt pulley from SDP-SI. As with Nophead, I found the worm-gear style pulley to be much superior.

My process was pretty simple. We’re testing the pull strength of the extruder only here, so it involved hooking up the filament drive portion to a force meter (fish scale) and running it until it either stopped or failed. Here’s my setup.
Force Meter
A fish scale 50lbs / 23 kg. I couldn’t figure out how to make it do metric. FAIL! It still worked reliably, and I got a rough sense of what forces were involved. Now that I know my range, I am purchasing a much nicer digital force meter. (Its held down by capa / shapelock… I know, I should really have printed that part)

Filament Harness
Since we’re measuring how hard the extruder pulls on the filament, we need a way to hook up the filament to the force meter. I ended up bolting the filament between two washers and then looping that over the hook. I only rarely had problems after that.

Extruder Drive System
No need for the hot end or anything like that for this test. I laid the electronics to the side. Then I just clamped it to the wood, making sure to clamp in the middle of the dinos and not too hard. The bolts dug into the wood after a bit and made it snap right into place.

Then I just did a bunch of test and measurements. The fish scale did not have a very fast update rate at all (5 seconds?) It also did not have a peak weight or anything like that. I just watched it and tried to remember the highest number. This was a big deal because sometimes the filament itself would either break or elongate and deform. There readings could be slightly low because of that. It was also a bit chilly in the Botcave (its late december
but I’m not going to go that deep on ya.
Here are the results as a google doc:
As for the extruder pulley, yes we will have these eventually. No idea on the timeframe, but having to wait is the price we pay for being as open as possible. I also made the silly mistake of making the diameter of the threaded parts different from the diameter of the current pinch wheel teeth. Its not much of a difference, but I’d like it to be a drop-in replacement. Its a really daunting thing to go into production on a part without a prototype, so it means I’ll probably need to get a new one made. I might have a few other variants made and see how they match up with the results from this one.